Free sample for DIN934, ISO4032, ISO4033, BS 3692, BS4190 Metric Hex Nuts Export to Grenada

Metric Size Steel Hexagon Nuts Dimension Standard: DIN934, ISO4032, ISO4033, BS 3692, BS4190,ASME B18.2.4.1M, ASME B18.2.4.2M, etc Metric Size: M5-M100 Class: ISO 898-2 class 4, 5, 6, 8, 10, 12. Various material grade are available. Finish: Plain, Black Oxide, Zinc Plated, Hot Dipped Galvanized, etc. Packing: Bulk about 25 kgs each carton, 36 cartons each pallet Advantage: High Quality, Competitive Price, Timely Delivery, Technical Support, Supply Test Reports Please feel free to contact us for more details.

  • Free sample for DIN934, ISO4032, ISO4033, BS 3692, BS4190 Metric Hex Nuts Export to Grenada Related Video:



    TIMING BELT REPLACEMENT – 2.2L 5SFE – Toyota Camry
    Toyota Camry Timing Belt Replacement
    Category:
    Autos & Vehicles
    Tags:
    Timing Belt Replacement
    Installation
    1.Install No. 2 idler pulley (if removed). Install and tighten bolt to specification. Ensure idler pulley is clean and rotates smoothly.

    2.Install No. 1 idler pulley and tension spring (if removed). Pry No. 1 idler pulley away from timing belt area as far as possible. Temporarily tighten No. 1 idler pulley bolt. Ensure idler pulley is clean and rotates smoothly.

    3.Using crankshaft pulley bolt, rotate crankshaft so timing mark on crankshaft sprocket aligns with timing mark on oil pump housing. See. This will position keyway in crankshaft sprocket at 12 o’clock position.

    CAUTION:If reusing timing belt, ensure reference marks on timing belt align with reference marks placed on crankshaft and camshaft sprockets. Ensure timing belt is installed in original direction of rotation.

    4.Ensure all sprockets and idler pulleys are clean. Install timing belt on crankshaft sprocket, oil pump sprocket, No. 1 idler pulley, and then No. 2 idler pulley in sequence.

    5.Install timing belt guide with cupped side away from crankshaft sprocket and flat side toward timing belt. Install No. 1 timing belt cover and new gasket.

    6.Align crankshaft pulley key groove with key in crankshaft. Install crankshaft pulley. Install and tighten crankshaft pulley bolt to specification.

    7.Rotate crankshaft clockwise so cylinder No. 1 is at TDC on compression stroke. Ensure timing mark on crankshaft pulley aligns with mark on No. 1 timing belt cover. If reusing timing belt, ensure reference mark on timing belt aligns with upper edge of No. 1 timing belt cover.

    8.Rotate camshaft, and align hole in camshaft sprocket with alignment mark on camshaft bearing cap. Install timing belt on camshaft sprocket. If reusing timing belt, ensure reference mark on timing belt aligns with the reference mark on camshaft sprocket. Ensure tension exists on timing belt between the crankshaft and camshaft sprockets.

    CAUTION:DO NOT rotate crankshaft counterclockwise, as viewed from timing belt end of engine.

    9.Loosen No. 1 idler pulley bolt 1/2 turn. Rotate crankshaft pulley 2 full revolutions clockwise from TDC to TDC. 10.Ensure timing mark on crankshaft pulley aligns with "0" mark on No. 1 timing belt cover, and hole in camshaft sprocket aligns with alignment mark on camshaft bearing cap. If timing marks are not aligned, remove timing belt and reinstall. 11.Rotate crankshaft clockwise 1 and 7/8 revolutions and align crankshaft pulley mark with 45-degree Before Top Dead Center (BTDC) mark on No. 1 timing belt cover.

    12.Tighten No. 1 idler pulley bolt to specification. Install No. 2 timing belt cover and gaskets. Install and tighten spark plugs to specification.

    13.To install remaining components, reverse removal procedure. Install all bolts/nuts on right (timing belt side) engine mount before tightening to specification.

    14.On Camry, when installing control rod and bracket on strut tower and right (timing belt side engine mount, tighten bolts to specification in sequence.