Online Exporter ASTM A193 B7 All Threaded Stud Bolts to Austria Factories

ASTM A193/A193M B7 All Threaded Stud Bolts

API 6A 6D Flange Valve Wellhead ASME/ANSI Flange All Thread Stud Bolts

Alloy steel bolting for pressure vessels, valves, flanges, and fittings for high temperature or high pressure service, or other special purpose applications.

Standard: IFI-136, ASME B16.5, DIN976

Inch Size: 1/4”-4” with various lengths

Metric Size: M6-M100 with various lengths

Other Available Grade:

ASTM A193/A193M B7, B7M, B16, B8 Class 1 & 2, B8M Class 1 & 2,

ASTM A320/A320M L7, L7M, L43, B8 Class 1 & 2, B8M Class 1 & 2, and so on.

Finish: Plain, Black Oxide, Zinc Plated, Zinc Nickel Plated, Cadmium Plated, PTFE etc.

Packing: Bulk about 25 kgs each carton, 36 cartons each pallet

Advantage: High Quality and Strict Quality Control, Competitive Price,Timely Delivery; Technical Support, Supply Test Reports

Please feel free to contact us for more details.


  • Online Exporter ASTM A193 B7 All Threaded Stud Bolts to Austria Factories Related Video:



    How to properly install a butterfly valve onto a Poly Processing IMFO®, Integrally Molded Flanged Outlet, polyethylene tank. When installing larger assemblies like a valve or flex joint on to a poly tank, an extra set of hands is helpful. Start with the gasket against the IMFO®. Hold the valve against it, take the backing ring and place it on.

    Now insert one all-thread and through the front of the assembly. Add a wedge washer, flat washer, and nut to the back of the assembly.

    Now that we’e added hardware to the back of the all thread, add the flex joint to the front of the butterfly valve. An important note at this stage is to not leave out the included spacer. The spacer is very important when we use a PVC flange against a PTF and composite flex joint. With stainless steel flanges, these spacers would not be required. Just like on the back side of the IMFO®, we’re going to add hardware top the front side of the all threads. The only difference is that there will not be a wedge washer on this side of the hardware. Tighten each nut down in a criss-cross pattern. Once all hardware is tightened, a crow’s foot can be used to get in between the two flanges and use an actual torque wrench to tighten to 20 ft-lbs

    Next, add the valve handle. Remove the retainer screw from the top of the assembly. Line up the pattern of the valve handle and press down in to place.

    Learn more about polyethylene tanks and fittings: https://www.polyprocessing.com/