Low price for DIN6921 ISO4162 Hexagon Flange Bolts and Screws for Cape Town Factory

Hexagon Flange Screws and Bolts Standard: DIN6921, ISO4162, ISO8102, ASME B18.2.3.9M, ASME B18.2.1, Metric Size: M6-M20 with various lengths Inch Size: 1/4”-3/4” with various lengths Material Grade: Carbon Steel, Alloy Steel, Stainless Steel covers grade ISO 898-1 4.8, 8.8, 10.9; SAE J429 Grade 5, 8; ASTM A193 B7, A320 L7; ASTM F593 A, B, C, D, E, F, G, H; ISO 3506 A2-70, A4-70 Finish: Plain, Black Oxide, Zinc Plated, Hop Dipped Galvanized, Dacromet, etc. Packing: Bulk about 25 kgs each carton, 36 cartons each pallet Advantage: High Quality and Strict Quality Control, Competitive Price,Timely Delivery; Technical Support, Supply Test Reports Please feel free to contact us for more details.

  • Low price for DIN6921 ISO4162 Hexagon Flange Bolts and Screws for Cape Town Factory Related Video:



    This is a quick video showing you how to remove the rear bumper on your Jeep JK. My JK is a 2015, but this video should apply to all model years with the driver side mounted tow hook (not the center mounted tow hook). This is a really simple process, but the locations of the bolts may be hard to find.

    You will need the following tools:
    5/8″ socket
    3/4″ socket
    socket wrench

    Note that the tow hook bolts required a lot of torque, so you may need a long-handled wrench to get them loose. I used my torque wrench to get them loose.



    In this video, OnlineEEI shows you step-by-step instructions on how to set up a portable pipe and drape backdrop kit using its 8 foot tall freestanding kit.

    For more information, please visit our event decorating products international store:

    https://www.onlineeei.com/

    Here are the written, step-by-step instructions:

    1. Remove screw from bottom of pin.
    2. Push screw from bottom side through hole in center of base plate.
    3. Tighten pin clockwise back onto screw with base plate in between. Repeat with second base plate and place them required width apart.
    4. Slide (unslotted) bottom half of upright onto pin. Join upper half of upright post (piece with slots at top) with the unslotted bottom piece. Repeat with second upright.
    5.The adjustable drape support rod is made up of 3 pieces: Two end pieces (each have a hook) and a middle piece (with 4 button holes). One of the end pieces is stored inside the middle piece. Pull this towards the hook side until the last button engages.
    6. Snap the other end piece into the other end of the middle piece. The width is adjustable by disengaging these buttons.
    7. Thread drapes onto adjustable drape support rod.
    8. Place hook on one end of drape support rod snugly into upright slot.
    9. Repeat with other end of drape support rod on second upright.

    There are many creative uses for Pipe and Drape such as backdrops, room dividers, traffic control, or decorating. Use them at your next event!

    Visit us on Facebook at https://www.facebook.com/onlineeei