High Efficiency Factory Metal Garden WindMill to moldova Manufacturer

8 FT. WINDMILL ORNAMENT, RED&GREEN Durable steel body with weather-resistant, green and yellow finish Permanently lubricated ball bearings for whisper-quiet operation Unique design features a fan head that always faces the wind Charming, decorative old-world design blends beautifully with any landscape Assembled height: 8ft / 2.4M Assembly required Please read the assembly and safety information enclosed Please feel free to contact us for more details.  

  • High Efficiency Factory Metal Garden WindMill to moldova Manufacturer Related Video:



    In addition to our road marking services we have been manufacturing specialist road marking and traffic management vehicles since 1992.

    As a company allied to the traffic management industry, we know first-hand the importance of versatility, flexibility and reliability when it comes to traffic management vehicles, and apply this expertise to every client project we undertake.

    In an industry subject to constant and continuous improvement to safety, we are proud to stay one step ahead of the field in terms of innovative design and usability. We sit down with potential clients, listen to their requirements and provide plans, pictures and size options that give a benchmark from which to start.

    In a departure from the standard vehicle we focus on specialist bespoke designs and fabrication.

    From this point onwards we develop and build a vehicle that is suitable for the task in hand.

    We provide vehicles to the whole of the UK that are developed and constructed at our specialist manufacturing workshop in Elland, West Yorkshire.

    https://www.wjlinklinegroup.com



    Departmental Procedures & Guidelines for Inspections, Certifications, Load Testing, Repairs & Painting of Fire Escapes
    Inspections by Structural Engineers, Fire Escape Engineers or others acceptable to the Official:
    In layman’s terms, the city official is looking for a registered structural engineer or others qualified and acceptable by the Fire/Code Official to do a Critical Examination in lieu of a Live Load Test (criteria submitted or discussed prior to inspection) and issues written verification and certification that all connections are free of internal rust or rot as well as all original hardware (square head bolts or rivet) are reinforced and or replaced in lieu of Live Load Test. All supports (thru-bolts or cemented) into the wall must be verified and certified in lieu of Live Load Test. A fire escape confidence test and tag must be submitted if fire escape passed. The report with photos identifying violations for repairs must include repair criteria submitted to the official for repair vendor to use as a guide during and with engineer oversight of permitted repairs. A Fire Escape Confidence Test and tags identifying certified condition are then submitted. Recommended cycle for live load testing is 20 yrs after total refurbishment or as required by official.

    Repairs by Ornamental Ironworkers, Welding Companies or others acceptable to the Official:

    In layman’s terms, the city official is looking for a qualified licensed repair vendor to do all work under repair permit (if required) with engineer oversight of repair criteria submitted for approval to the official in lieu of Live Load Test. All connections must be free of internal rust or rot, spot primed and sealed. All worn material repaired and or replaced. All supports into wall reinforced, repaired and certified in a Fire Escape Confidence Test. In lieu of Live Load Test, all square head bolts, rivets and or welded connections must be certified, reinforced and or replaced based on age or condition. All ladders and cantilevers must be balanced and drop 2-3 ft per second, hit the ground and stay down and must lead to a public way. All roof ladders must be secure. No full painting of any fire escape until all spot painted repairs are inspected and certified under engineer oversight and or city official permit sign-off. Full replacement is subject to permits and or possible code upgrade requirements.
    Painting by EPA Licensed Renovators (if lead paint is present) or others acceptable to Official:
    In layman’s terms, the city official is looking for a paint vendor (EPA Certified Renovator if required) to do all work as per EPA Guidelines due to the fact that all fire escapes older than 1978 are presumed to have lead (EPA) unless identified as no lead or low lead by a licensed lead inspector. Entire building will be notified with signage and all precautions shall be taken to collect paint chips at grade. No sandblasting or power assisted scraping without full fire escape encapsulation under EPA Guidelines. All major connection shall be sealed from water intrusion before during or after painting. All escapes should be spot painted every 3-5 yrs and fully painted every 5-10 yrs or as needed or ordered by a Fire/Code Official.