Wholesale price for ASTM A193 B7 All Threaded Rods Threaded Bars Export to Madrid

ASTM A193/A193M B7 All Threaded Rods All Threaded Bars API Flange Valve Wellhead All Thread Stud Bolts Alloy steel bolting for pressure vessels, valves, flanges, and fittings for high temperature or high pressure service, or other special purpose applications. Standard: IFI-136, DIN975 Inch Size: 1/4”-4” with various lengths Metric Size: M6-M100 with various lengths Other Available Grade: ASTM A193/A193M B7, B7M, B16 B8 Class 1 & 2, B8M Class 1 & 2, ASTM A320/A320M L7, L7M, L43, B8 Class 1 & 2, B8M Class 1 & 2, and so on. Finish: Plain, Black Oxide, Zinc Plated, Zinc Nickel Plated, Cadmium Plated, PTFE etc. Packing: Bulk about 25 kgs each carton, 36 cartons each pallet Advantage: High Quality and Strict Quality Control, Competitive Price,Timely Delivery; Technical Support, Supply Test Reports Please feel free to contact us for more details.

  • Wholesale price for ASTM A193 B7 All Threaded Rods Threaded Bars Export to Madrid Related Video:



    There are various methods of how to set deck posts and footings which typically consists of digging below the frost line and setting posts on concrete. For these steps you will need an earth auger, post hole digger and spud bar, shovel, tape measurer, utility knife, landscape fabric, gravel, concrete, wheelbarrow, mortar hoe, a water source, deck posts and a post level.

    To dig posts holes either use a shovel, a post hole digger and spud bar or an auger. An auger will make this task a lot easier, but it does require some strength. Use a shovel to get rid of the excess dirt. Once you have reached the depth required by code move onto the next hole. Lay out the landscape fabric. Cut the areas for the holes, and you’re ready to set the posts.

    Make sure your posts are long enough to reach the proper height once they are set in the ground. Mix your concrete and scoop it into the hole. Use a small post to mix the concrete, eliminating air pockets to ensure it’s level. When the concrete is set, place the post in the footing and make sure it is level and against the marked line. Fill the hole with gravel. Once all the posts are filled, spread the gravel out on the fabric. Let the concrete dry for several days to ensure that the footings are strong.

    Attach the beams that will support the decking. You will need beams, a square, chalk line and line level, circular saw, drill with bits, a 2′x4′, a 3lb hammer, carriage bolts, washers and nuts, socket wrench and sockets, screws or nails, clamps and a reciprocating saw. Use carriage bolts to secure the beams to the posts. Next use the line you drew against the house in the previous video to mark a chalk line against your posts. Use a level to make sure the lines are even. Do this to all posts. Next measure down the width of the beam to make a mark where you will attach cleats. Use a 2′x4′ where you will set the posts, and attach with nails or screws. Cut your beams to length. Make sure that the crown side is up as you attach the beams to the posts. Clamp the beams if you need to, drill the bolt holes, hammer in the bolts and tighten. Now cut the posts to length. With the foundation set, we are now ready to start framing.

    Watch part 4 of Lowe’s How to Build a Deck series here: https://www.youtube.com/watch?v=MPOLcSDYJIU

    Subscribe to Lowe’s YouTube for great how to videos and home improvement tips: https://www.youtube.com/subscription_center?add_user=lowes

    Or head to our channel: https://www.youtube.com/Lowes



    Debunking every single 9/11 conspiracy theory, one at a time.

    TAGS: World Trade Center United American Airlines Flight 11 175 77 93 WTC Building 7 WTC7 Pentagon missile Global Hawk Twin Towers squibs thermite thermate explosives Popular Mechanics truth movement inside job collapse bombs explosions Loose Change recut 2nd second cut Final Cut 9/11 Mysteries coincidences Alex Jones Show Illuminati New World Order NWO Dylan Avery Jason Bermas Korey Rowe Sophia Shafquat Steven Jones James Jim Fetzer David Ray Griffin Kevin Barrett Ryan Judy Wood Richard Gage Architects Engineers Scholars Pilots Patriots Question 9/11 Truth truthers twoof twoofers debunking debunkers