Reliable Supplier ASME B18.3 Socket Set Screws for luzern Factory

ASME B18.3 Socket Set Screws

Imperial Thread Size: 0# - 2"

Various Drive and Point Types

Various Surface Finishes

Other Material Grades are available

Please feel free to contact us for more details


  • Reliable Supplier ASME B18.3 Socket Set Screws for luzern Factory Related Video:



    How to replace the shaft seal on a KM pump

    00:13 Step1. Remove the bearing cap
    00:23 Step2. Remove the grease
    00:29 Step3. Remove the lock washer and the shaft nut
    00:57 Step4. Remove the bearing housing
    01:50 Step5. Remove the retainer ring
    02:12 Step6. Remove the used shaft seal
    02.29 Step7. Mount the new shaft seal
    02:42 Step8. Clean the sealing surface carefully
    02:50 Step9. Mount the carbon ring in the container ring
    03:02 Step10. Clean the sealing surface of the carbon ring
    03:07 Step11. Mount the retainer
    03:34 Step12. Remove the rear cap and the bearing from the bearing housing
    03:52 Step13. Mount the rear cap again loosely
    03:59 Step14. Mount the bearing housing
    04:45 Step15. Mount the bearing
    05:09 Step16. Mount the shaft nut and the lock washer
    05:25 Step17. Mount the bearing cap loosely
    How to line up the rotor
    05:38 Step1. Make sure that the four bolts in the front bearing cap are tighten
    05:43 Step2. Place a precision clock on the shaft
    05:58 Step3. Force the rotor back until it makes contact with the rear flow plate
    Now the rotor has contact with the flow plate and cannot be turned by hand
    06:24 Step4. Loosen the bearing cap again
    06:43 Step5. Reset the clock (O)
    06:59 Step6. Force the rotor forward until it makes contact with the front flow plate
    07:13 Step7. Make sure that the rotor has contact with the front flow plate
    07:18 Step8. Note the rotors total moving space
    In the case 0.36 mm
    07:41 Step9. Move the rotor back again and ensure the equal space in both ends of the rotor
    In this case 0.36mm/2=0.18mm
    08:12 Step10. Lock the bear bearing by tightening the flour bolts
    The rotor is now centered and locked
    08:31 Step11. Check that the rotor is running free
    08:42 Step12. Grease the pump according to the manual

    For more information please visit: https://www.samson-pumps.com



    Part icon, part iconoclast, Melvin Van Peebles is a prolific and multi-talented artist with a life story as fascinating as his work. Never deterred by rejection, Van Peebles made his name with one of the most controversial films ever made, the self-produced Sweet Sweetback’s Baadasssss Song, which redefined independent cinema and single-handedly sparked the Blaxploitation era. But this award-winning documentary shows that the story doesn’t end there, playfully charting Van Peebles’s incredible journey from Air Force pilot to civil rights activist to French novelist to Wall Street trader—a remarkable, rollicking tale that reveals how Sweet Sweetback really got his song.
    Full of rare archival footage and unforgettable backstage stories from Spike Lee, Mario Van Peebles, Gordon Parks and others, How to Eat Your Watermelon in White Company (and Enjoy It) is a provocative and humorous portrait of a man whose groundbreaking impact on art, politics and pop culture remains as relevant as ever.