High Quality DIN 74361-H Flat Collar Nuts Wheel Nuts with Washers for Sri Lanka Manufacturers

DIN 74361-H Flat Collar Nuts Wheel Nuts for Heavy Truck and Bus Standard: DIN 74361-H Metric Size: M12-M22 Material Grade: Carbon Steel, Alloy Steel, covers grade ISO 898-2 class 10, 12 Finish: Plain, Black Oxide, Zinc Plated, Hop Dipped Galvanized, Dacromet, etc. Packing: Bulk about 25 kgs each carton, 36 cartons each pallet Advantage: High Quality and Strict Quality Control, Competitive Price,Timely Delivery; Technical Support, Supply Test Reports Please feel free to contact us for more details.

  • High Quality DIN 74361-H Flat Collar Nuts Wheel Nuts with Washers for Sri Lanka Manufacturers Related Video:



    Ty ren/Thanh ren- Thread rod mạ điện; Ty ren /Ty treo/ Thanh ren/Ty răng mạ kẽm nhúng nóng M6, M8, M10, M12, M16, M20- TCVN 197:2002/JIS B 1051 /DIN 975/DIN 976 (High quality Thread rod), Khớp nối ty ren (Thread rod coupling), Bịt đầu ty (Plastic end cap for thread rod), Tắc kê đạn (Drop in Anchor), Tắc kê tường (Anchor Bolts), Tắc kê chuồn (Heavy duty concrete Insert) mua bán thanh ren/ty ren mạ kẽm nhúng nóng, cở sở sản xuất thanh ren – ty ren mạ điện, báo giá thanh ren, thanh ren giá rẻ, địa chỉ bán thanh ren, thanh ren suốt, thanh ren mạ kẽm, báo giá thanh ren
    TY REN M10- M12, , Ống thép luồn dây điện-ống ruột gà luồn dây điện lõi thép, Máng cáp dạng lưới, Unistrut 41 x 41
    Quý khách vui lòng liên hệ:
    CÔNG TY TNHH THIẾT BỊ ĐIỆN CÔNG NGHIỆP CÁT VẠN LỢI
    Website: https://catvanloi.com – https://vattudien.vn – www.tytreocuongluccao.com
    www.tyrenthep.net
    504 Lê Quang Định, P.1, Quận Gò Vấp, TP Hồ Chí Minh
    Tel: (08) 3588 6496 / 2246 4699 – www.tyrensuot.com-www.tyrensuot.net
    Tư Vấn Và Giải Đáp Về Sản Phẩm CVL® Xin Vui Lòng Liên Hệ: 1900 5555 49.
    Email: baogia@catvanloi.com – sales@catvanloi.com – projectsales@catvanloi.com



    Departmental Procedures & Guidelines for Inspections, Certifications, Load Testing, Repairs & Painting of Fire Escapes
    Inspections by Structural Engineers, Fire Escape Engineers or others acceptable to the Official:
    In layman’s terms, the city official is looking for a registered structural engineer or others qualified and acceptable by the Fire/Code Official to do a Critical Examination in lieu of a Live Load Test (criteria submitted or discussed prior to inspection) and issues written verification and certification that all connections are free of internal rust or rot as well as all original hardware (square head bolts or rivet) are reinforced and or replaced in lieu of Live Load Test. All supports (thru-bolts or cemented) into the wall must be verified and certified in lieu of Live Load Test. A fire escape confidence test and tag must be submitted if fire escape passed. The report with photos identifying violations for repairs must include repair criteria submitted to the official for repair vendor to use as a guide during and with engineer oversight of permitted repairs. A Fire Escape Confidence Test and tags identifying certified condition are then submitted. Recommended cycle for live load testing is 20 yrs after total refurbishment or as required by official.

    Repairs by Ornamental Ironworkers, Welding Companies or others acceptable to the Official:

    In layman’s terms, the city official is looking for a qualified licensed repair vendor to do all work under repair permit (if required) with engineer oversight of repair criteria submitted for approval to the official in lieu of Live Load Test. All connections must be free of internal rust or rot, spot primed and sealed. All worn material repaired and or replaced. All supports into wall reinforced, repaired and certified in a Fire Escape Confidence Test. In lieu of Live Load Test, all square head bolts, rivets and or welded connections must be certified, reinforced and or replaced based on age or condition. All ladders and cantilevers must be balanced and drop 2-3 ft per second, hit the ground and stay down and must lead to a public way. All roof ladders must be secure. No full painting of any fire escape until all spot painted repairs are inspected and certified under engineer oversight and or city official permit sign-off. Full replacement is subject to permits and or possible code upgrade requirements.
    Painting by EPA Licensed Renovators (if lead paint is present) or others acceptable to Official:
    In layman’s terms, the city official is looking for a paint vendor (EPA Certified Renovator if required) to do all work as per EPA Guidelines due to the fact that all fire escapes older than 1978 are presumed to have lead (EPA) unless identified as no lead or low lead by a licensed lead inspector. Entire building will be notified with signage and all precautions shall be taken to collect paint chips at grade. No sandblasting or power assisted scraping without full fire escape encapsulation under EPA Guidelines. All major connection shall be sealed from water intrusion before during or after painting. All escapes should be spot painted every 3-5 yrs and fully painted every 5-10 yrs or as needed or ordered by a Fire/Code Official.