Factory Supplier for ASTM A320 L7 All Threaded Stud Bolts for Mongolia Factory

ASTM A320/A320M L7 All Threaded Stud Bolts Alloy steel bolting for pressure vessels, valves, flanges, and fittings for low-temperature service. Standard: IFI-136, ASME B16.5, DIN976 Inch Size: 1/4”-2.1/2” with various lengths Metric Size: M6-M64 with various lengths Other Available Grade: ASTM A193/A193M B7, B7M, B16 B8 Class 1 & 2, B8M Class 1 & 2, ASTM A320/A320M L7, L7M, L43, B8 Class 1 & 2, B8M Class 1 & 2, and so on. Finish: Plain, Black Oxide, Zinc Plated, Zinc Nickel Plated, Cadmium Plated, PTFE etc. Packing: Bulk about 25 kgs each carton, 36 cartons each pallet Advantage: High Quality and Strict Quality Control, Competitive Price,Timely Delivery; Technical Support, Supply Test Reports Please feel free to contact us for more details.

  • Factory Supplier for ASTM A320 L7 All Threaded Stud Bolts for Mongolia Factory Related Video:



    Videos are provided as a guide only. Refer to manufacturer
    installation instructions and specs for complete information.

    So you are in the middle of doing your hitch installation and you are in the process of taking out one of your existing factory bolts. In the process you find that the bolt is not coming out due to the fact that the weld nut inside the frame has broken. We are just going to go ahead and show you a couple of things you can do to not only get the bolt out of the way but to also go ahead and continue on to be able to put your hitch in position without the weld nut welded inside the frame. The first thing that we obviously need to do is go ahead and get the bolt out of here. There are a couple of different ways you can do this. You can take a chisel, is you have one large and strong enough to do so, and possible grind the head of the bolt off. Or you can actually take a torch and torch it off. And that is actually what we are going to do on this application here. I am going to try to get most or as much of the head of the bolt off as I can. And we will take and push the remaining section of the bolt-weld nut combination up inside the frame. 0:49



    Byelorussian Steel Works consists of four main production facilities connected by a single processing chain, namely: steel melting, rolling, steel cord and wire production and pipe-rolling. The plant also includes number of auxiliary divisions and an administrative division.

    Steel-melting production includes a scrap preparation shop and two electric steel melting shops. Rolling production consists of a section rolling shop, which includes three rolling mills with different profiles.

    Steel cord and wire production is represented by three steel cord and wire shops, a powder metallurgy and die workshop, and a technological packing workshop.

    Pipe-rolling production is located in a separate building with area of 40 thousand square meters.

    The company’s infrastructure consists of maintenance and repair departments for power, electrical and mechanical equipment, a railway workshop, an automobile workshop and other auxiliary divisions.