Europe style for Segment Bolts for Construction Machinery to Milan Manufacturer

Professional manufacturer of Segment Bolts with Nuts, feature a hexagon or D shape head, secure the sprocket segments in crawler equipments. Normally the diameter of unthreaded body is bigger than thread.   Fit for Caterpillar, Volvo, Doosan, Komatsu, Komelco, Ajax, JCB, BYG Inch Size: 3/8”-1.3/8” with various lengths Metric Size: M10-M36 with various lengths Grade: SAE J429 Grade 5, 8; 170 KSI, 180 KSI; ISO 898-1 class 8.8, 10.9, 12.9 Finish: Plain, Black Oxide, Zinc Plated, and so on Packing: Bulk about 25 kgs each carton, 36 cartons each pallet Advantage: High Quality and Strict Quality Control, Competitive Price,Timely Delivery; Technical Support, Supply Test Reports Please feel free to contact us for more details.

  • Europe style for Segment Bolts for Construction Machinery to Milan Manufacturer Related Video:



    https://amzn.to/2f2pooO This saw is perfect for this job.
    https://amzn.to/2dl334i Click link to get a great tool for this layout process. The guide that comes with this square walks you through how to use the tool for determining existing pitch, cutting birdsmouths, and stucturing your roof. Also Amazon sells Brass square gauges that lock to your square for laying out stairs and roofs.
    How to layout roofing rafters. How to lay out roof rafters. How to calculate the length of roof rafters using a framing square. Disclaimer:
    Doublewide6 has a Master’s Degree in industrial technology with a specialization in Manufacturing, due to factors beyond the control of Doublewide6 and anyone featured in his videos, I cannot guarantee against improper use or unauthorized modifications of this information. Doublewide6 assumes no liability for property damage or injury incurred as a result of any of the information contained in this video or any of Doublewide6’s videos. Use this information at your own risk. Doublewide6 recommends safe practices when working on equipment, power tools, chemicals, electronics, electrical systems, vehicles, and or with tools seen or implied in this video. Due to factors beyond the control of Doublewide6, no information contained in this video shall create any expressed or implied warranty or guarantee of any particular result. Any injury, damage, or loss that may result from improper use of these tools, equipment, or from the information contained in this video is the sole responsibility of the user and not Doublewide6. Please support Doublewide6 by donating to his Patreon Account https://www.patreon.com/doublewide6



    Departmental Procedures & Guidelines for Inspections, Certifications, Load Testing, Repairs & Painting of Fire Escapes
    Inspections by Structural Engineers, Fire Escape Engineers or others acceptable to the Official:
    In layman’s terms, the city official is looking for a registered structural engineer or others qualified and acceptable by the Fire/Code Official to do a Critical Examination in lieu of a Live Load Test (criteria submitted or discussed prior to inspection) and issues written verification and certification that all connections are free of internal rust or rot as well as all original hardware (square head bolts or rivet) are reinforced and or replaced in lieu of Live Load Test. All supports (thru-bolts or cemented) into the wall must be verified and certified in lieu of Live Load Test. A fire escape confidence test and tag must be submitted if fire escape passed. The report with photos identifying violations for repairs must include repair criteria submitted to the official for repair vendor to use as a guide during and with engineer oversight of permitted repairs. A Fire Escape Confidence Test and tags identifying certified condition are then submitted. Recommended cycle for live load testing is 20 yrs after total refurbishment or as required by official.

    Repairs by Ornamental Ironworkers, Welding Companies or others acceptable to the Official:

    In layman’s terms, the city official is looking for a qualified licensed repair vendor to do all work under repair permit (if required) with engineer oversight of repair criteria submitted for approval to the official in lieu of Live Load Test. All connections must be free of internal rust or rot, spot primed and sealed. All worn material repaired and or replaced. All supports into wall reinforced, repaired and certified in a Fire Escape Confidence Test. In lieu of Live Load Test, all square head bolts, rivets and or welded connections must be certified, reinforced and or replaced based on age or condition. All ladders and cantilevers must be balanced and drop 2-3 ft per second, hit the ground and stay down and must lead to a public way. All roof ladders must be secure. No full painting of any fire escape until all spot painted repairs are inspected and certified under engineer oversight and or city official permit sign-off. Full replacement is subject to permits and or possible code upgrade requirements.
    Painting by EPA Licensed Renovators (if lead paint is present) or others acceptable to Official:
    In layman’s terms, the city official is looking for a paint vendor (EPA Certified Renovator if required) to do all work as per EPA Guidelines due to the fact that all fire escapes older than 1978 are presumed to have lead (EPA) unless identified as no lead or low lead by a licensed lead inspector. Entire building will be notified with signage and all precautions shall be taken to collect paint chips at grade. No sandblasting or power assisted scraping without full fire escape encapsulation under EPA Guidelines. All major connection shall be sealed from water intrusion before during or after painting. All escapes should be spot painted every 3-5 yrs and fully painted every 5-10 yrs or as needed or ordered by a Fire/Code Official.
    Fire Escape Codes:
    NFPA Lifesafety Code 101 7.2.8.6.2 The authority having jurisdiction shall be permitted to approve any existing fire escape Stair that has been shown by load test or other satisfactory evidence to have adequate strength.