13 Years Factory wholesale Din2510 Double End Studs with Reduced Shank with Hexagon Nuts for Brunei Factory

Din2510 Double End Studs with Reduced Shank with Hexagon Nuts Standard: Din 2510 Form L, Z, K, ZU/KU, GP, GQ, GR, GS, HP, HQ,NF, TF, AF/AFO, BF/BFO Metric Thread Size: M12-M100 with various lengths Available Material or Grade: ASTM 193/320 B7, B7M, L7, L7M, B16, B8, B8M, B8T CL1&CL2 ASTM 194 2H, 2HM, 4, 7, 7M, 8, 8M ASTM A453 660 ISO 898-1 5.8, 6.8, 8.8, 10.9, 12.9 1.1181 / C35E 1.1191 / C45E 1.7218 / 25CrMo4 1.7225 / 42CrMo4 1.7709 / 21CrMoV5-7 1.7711 / 40CrMoV4-6 1.7729 / 20CrMoVTiB4-10 1.4913 / X19CrMoNbVN11-1 1.4923 / X22CrMoV12-1 1.4980 / X6NiCrTiMoVB25-15-2) 1.4986 / X7CrNiMoBNb16-16 Inconel 625, Inconel 718, Duplex, SuperDuplex   Finish: Plain, Black Oxide, Zinc Plated, Zinc Nickel Plated, Cadmium Plated, PTFE etc. Packing: Bulk about 25 kgs each carton, 36 cartons each pallet Advantage: High Quality and Strict Quality Control, Competitive Price,Timely Delivery; Technical Support, Supply Test Reports Please feel free to contact us for more details.  

  • 13 Years Factory wholesale Din2510 Double End Studs with Reduced Shank with Hexagon Nuts for Brunei Factory Related Video:



    Subscribe to our channel for the latest training videos, climbing tutorials and more! In this video we review how to create a top rope anchor using a double-length sling (also known in the United States as a 4-foot sling). To create this type of top rope anchor, you’ll need the following:

    1 – Double-length sling
    2 – Non-locking carabiners for the bolts
    AND
    1 – Locking carabiner -and- 1 non-locking carabiner
    OR
    2 – non locking carabiners for the Master Point

    Step 1 – Clip the two non-locking carabiners into the bolted anchor points (one carabiner for each bolt).

    Step 2 – Take your double-length sling and clip it into both of the non-locking carabiners at the anchor points.

    Step 3 – Pull the sling through the carabiners so you have two strands in your hand, and pull tightly in the direction of the climber to equalize.

    Step 4 – Slightly above where you’re holding the sling (roughly 6 inches), pinch the two legs of the anchor together and tie a figure-eight-on-a-bight (so you end up with a tied off loop in your sling). This tied off loop is your Master Point. See above video for demonstration.

    Step 5 – Clip a locking and non-locking carabiner (or two non-locking carabiners), opposite and opposed, into the Master Point.

    We hope you found this video helpful. Feel free to comment below with questions or thoughts!

    Please remember, climbing is inherently dangerous. Climb at your own risk. Visit https://ClimbingTechTips.com for related comments, additional videos, and community feedback!



    To celebrate the end of their undergraduate careers, members of the Class of 2018 summarize their creative and intellectual discoveries.

    Each student explains his or her Capstone project in just 10 seconds while standing in front of a green screen constructed from an image, video, or keyword related to their project.

    Visit our website: https://nyuad.nyu.edu/en/
    Facebook: https://www.facebook.com/NYUAD
    Twitter: https://twitter.com/NYUAbuDhabi
    Instagram: https://instagram.com/nyuabudhabi