Popular Design for ASTM F3125 High Strength Structural Bolts to Iran Factory

 ASTM released a new standard in 2015, This specification is a consolidation and replacement of six ASTM standards, including; A325, A325M, A490, A490M, F1852 and F2280. Bolts manufactured under this specification are intended for use in structural connections covered in the Specification for Structural Joints Using High-Strength Bolts, as approved by the Research Council on Structural Connections   Dimension: ASME/ANSI B18.2.6, ASME/ANSI B18.2.3.7M Various head geometries or special thread lengths are available under this new standard. Inch Thread Size: 1/2"-1.1/2" with various lengths Thread Size: M12-M36 with various lengths Grade: A325, A325M, A490, A490M, F1852 and F2280. Finish: Black Oxide, Zinc Plating, Hot Dip Galvanized, Mechanically Galvanized, and so on Packing: Bulk about 25 kgs each carton, 36 cartons each pallet. Or, comply with your requirement. Advantage: High Quality and Strict Quality Control, Competitive price,Timely delivery; Technical support, Supply Test Reports Please feel free to contact us for more details.  

  • Popular Design for ASTM F3125 High Strength Structural Bolts to Iran Factory Related Video:



    Klein Tools CL2000 AC/DC True RMS Clamp Meter: Amazon.com: https://amzn.to/1RdXjqq

    Fluke -A1-II Volt-Alert AC Non-Contact Voltage Tester: Amazon.com: https://amzn.to/13Tw7CY

    Klein Tools NCVT-3 Non-Contact Voltage Tester with Flashlight: Amazon.com: https://amzn.to/1GteIpK

    Wago 221-415 LEVER-NUTS 5 Conductor Compact Connectors 25 PK: Amazon.com: https://amzn.to/1WyoLio

    Wago (25) 2 connector (25) 3 connector (25) 5 connector Lever-Nut Assortment Pack: Amazon.com: https://amzn.to/1MhMXoZ

    Wago 221-413 LEVER-NUTS 3 Conductor Compact Connectors 50 PK: Amazon.com: https://amzn.to/25boeJ9

    Wago 221-412 LEVER-NUTS 2 Conductor Compact Connectors 100 PK: Amazon.com: https://amzn.to/1RrpJz1

    Milwaukee 48-22-2202 3PC 1000V Insulated Screwdriver Set: Amazon.com: https://amzn.to/Rp97u7

    Klein Tools 11055 Klein Tools-Kurve Wire Stripper/Cutter, Blue with Yellow Stripe, 10 – 20 ga. – Wire Stripping Tool – Amazon.com: https://amzn.to/22ulZP0

    Leviton 5691-2W 15 Amp, 120/277 Volt, Decora Plus Rocker Single-Pole AC Quiet Switch, Commercial Grade, White – Wall Light Switches – Amazon.com: https://amzn.to/1LxeGlk

    Leviton 5603-2W 15 Amp, 120/277 Volt, Decora Rocker 3-Way AC Quiet Switch, Residential Grade, Grounding, White – Wall Light Switches – Amazon.com: https://amzn.to/1Rrqsjr

    3M 88 Electrical Tape, .75-Inch by 66-Foot by .0085-Inch: Amazon.com: https://amzn.to/25bpNH1

    3M Scotch #35 Electrical Tape Value Pack (10457NA): Amazon.com: https://amzn.to/21ANfZH

    Ideal 30-3392 Solid Wire Grounding Tails, 12 AWG Solid, 8″ Tail with Loop and Ground Screw and Stripped End (Pack of 50): Wire Terminals: Amazon.com: https://amzn.to/1pT68eA

    Leviton 80301-SW 1-Gang Decora Plus Wallplate Screwless Snap-On Mount, White: Amazon.com: https://amzn.to/1TWOUK5

    Milwaukee 2753-22CT 18V Cordless M18 FUEL Lithium-Ion Brushless 1/4 in. Hex Impact Driver Kit: Amazon.com: https://amzn.to/1liNPNl

    Milwaukee 2753-20 M18 FUEL 1/4″ Hex impact Driver (Bare Tool)-Torque 1800 in lbs: Amazon.com: https://amzn.to/1MRN8BZ

    Milwaukee 2897-22 M18 18-Volt Lithium-Ion Cordless Brushless Hammer Drill/Impact Driver Combo Kit (Latest Model): Amazon.com: https://amzn.to/1RLjs0d

    Leviton 80301-SW 1-Gang Decora Plus Wallplate Screwless Snap-On Mount, White: Amazon.com: https://amzn.to/1TWOUK5

    Knipex 0908240US 9-Inch High Leverage Linemans NE Style, 1000-Volt – Pliers – Amazon.com: https://amzn.to/1SoACyr

    Milwaukee 48-22-8110 Electricians Work Belt, 29 pockets: Amazon.com: https://amzn.to/1iJs5bU

    Greenlee 701K-G/6A Professional Tone and Probe Tracing Kit, Standard with ABN Test Clips: Amazon.com: https://amzn.to/1nPQBLj

    Dakota 1 Light Brushed Nickel 4h x 6w x 2.7d Nickel – Wall Sconces – Amazon.com: https://amzn.to/1R5VADf

    Milwaukee 48-22-2302P 10-in-1 Ratcheting Multi Driver Square Drive Bits with 8-in-1 Compact Driver: Amazon.com: https://amzn.to/1KnNggT

    NFPA 70®, National Electrical Code® (NEC®), 2014 Kindle Edition: Amazon.com: https://amzn.to/2cpihX4

    Milwaukee 48-22-2113 11 In 1 ECX Multi tip Screwdriver/Nutdriver – Milwaukee Tools – Amazon.com: https://amzn.to/1OJCpz8

    To make this video I used the AmazonBasics 60-Inch Lightweight Tripod with Bag: Camera & Photo: https://amzn.to/15dgecs

    The voice-over was done with: Amazon.com: Blue Microphones Yeti USB Microphone – Silver: https://amzn.to/1CzgFiE

    The software used to edit and produce this video is Cyberlink PowerDirector 14 Ultimate: Amazon.com: https://amzn.to/1VtTWyZ

    The video was taken with the: Amazon.com: Panasonic LUMIX GH4 Body DMC-GH4GC-K 16.05MP Digital Single Lens Mirrorless Camera: https://amzn.to/1RMPrgM and the: Panasonic X Series H-HS12035 Lumix G 12-35mm F2.8 ASPH Lens: https://amzn.to/1Wi6TZg

    This video was made using the: Transcend 64GB Class 10 SDXC Flash Memory Card (TS64GSDXC10E): https://amzn.to/1w02Oxn

    Amazon.com Gift Cards – In a Greeting Card – Free One-Day Shipping https://amzn.to/1qMbKkI

    Amazon Student: Free Two-Day Shipping for six months, discounted Prime, and other exclusive deals for college students: https://amzn.to/1k42nJS

    Free 30 day trial of Amazon Prime (free 2 day shipping, free movies and TV shows, and borrow books from Kindle library for free): https://www.amazon.com/gp/prime/signup…

    Bill and https://sparkychannel.com are participants in the Amazon Services LLC Associates Program, an affiliate advertising program designed to provide a means for sites to earn advertising fees by advertising and linking to Amazon.com



    This video shows the user how to hang a DVX display cabinet on a video scoreboard.

    Video Transcript:

    Welcome to DVX product Installation Overview Video: Hanging the Display Cabinet.

    Prior to hanging the sections, an installer must perform a structural verification of the structure. To verify the stringer width, the installer will compare all measurements to the contract specific drawing. Measure the distance from one end of the lowest stringer to the other. Mark the center point on the structure for installation reference. Repeat the measurement for each stringer level. To verify stringer location, measure from the top of the lowest stringer top of steel to the top of steel for each stringer level above. Repeat these measurements at both ends of each stringer, at each vertical support, and at mid-span of any spans over 25 feet. If stringers are more than ½” away from designed location, contact the Project Manager.

    To verify stringers are generally in line, also called ends are plumb, hang a plumb bob from the end of the top stringer such that the string doesn’t touch any stringers. Measure from the string to the end of each stringer. Repeat these measurements at both ends of the structure. If the ends of the stringer are more than plus or minus 1 inch from plumb, contact the Project Manager. To verify front faces of stringers are plumb to each other, hang a plumb bob from above the top stringer, so that the string doesn’t touch any stringers, and measure from the string to front face of each stringer. Repeat these steps at both ends and the middle of the stringer. If measurements vary by more than plus or minus ½ inch contact the Project Manager.

    To verify the bottom stringer is straight. At both ends of the bottom stringer, measure back a set distance (X) from the front face of the stringer and stretch a line tight between those points. Measure from the front face of the stringer to the string line at approximately 10 foot intervals along the length of the stringer. Repeat measurement for additional bottom stringers. If measurements vary by more than plus or minus ½ inch contact the Project Manager.

    Hanging the display to the steel frame is the next step in the process. A crane picks up the display using the lift points. Eye bolts are used for tag lines. As the crane is lifting the Next Section from the crate, it is essential the display cabinet does not hit anything and that the other displays are anchored so they don’t fall over. As the display is raised, a person or persons will tether the display cabinet so it does not get damaged. Before you hang the first display cabinet find the centerline of the steel structure. It is recommended that the first display cabinet hung is the bottom center. Make sure the clip angles are loose before flying the display cabinet.
    After the first display cabinet is centered and level, ensure a plum measurement is taken before fastening securely. Then move in a left outward direction to hang the cabinets. Once completed, hang the cabinets in a right outward direction of the center cabinet on the bottom row. When the bottom row is hung proceed to the next level up by hanging the center display cabinet and move outward hanging cabinets in a left and right direction.

    Here is a fastening sequence to help the Installer hang the cabinets correctly. Make sure the clip angles are loose before flying the display cabinet. The section must be plum and level. All other sections to be hung rely on this. Set the clip angles and tighten them to the display. Permanently attach the clip angles to the structure using the method called out for in the contract specific shop drawing.
    The next display section will be hung to the left and right of the center display. Follow the configuration drawing sequence. Before flying the rest of the sections on the row loosen the top and bottom clip angles. Slide the top down and the bottom up. Use precision blocks in the corners of the cabinets to align the cabinets together. Temporarily secure the vertical portion of the section to the structure.

    **Video Transcript continued in comments**