Low price for DIN6915 10HV Structural nuts to Uganda Manufacturers

Din6915 10V Hex Nuts for High-Strength Structural bolting Dimension Standard: DIN6915 Metric Size: M12-M36 Material Grade: ISO 898-2 class 10 Finish: Plain, Black Oxide, Zinc Plated, Hot Dipped Galvanized, etc. Packing: Bulk about 25 kgs each carton, 36 cartons each pallet Advantage: High Quality, Competitive Price, Timely Delivery,Technical Support, Supply Test Reports Please feel free to contact us for more details.    

  • Low price for DIN6915 10HV Structural nuts to Uganda Manufacturers Related Video:



    website:https://www.jhmindustry.com/
    Shanghai Jian & Mei Industry and Trade Co., Ltd. is the company which manufacture and export fasteners and metal hardware, founded in 2006, with import-export authority. Now, 80% products export to all over the world and 20% sell in domestic market.



    Weinstein construction preforms another soft story retrofit on an apartment complex building in Los Angeles, California in compliance with Ordinance 183893 and Ordinance 184081. The process starts with the permit. Once structural engineering plans are approved by the city, the Tenant Habitability Plan is filed and processed per city requirements. Structural Observations during construction by designated Professional Engineers per city documenting will also occur. To keep the strength of the building while construction is being done, temporary Shoring of Second Story is erected over work area. Trench Shoring and Trench Cover Plates are placed over open trenches. At this time if required,Seismic Gas Shut Off Valves would be installed for each gas meter as well as, Water Heater Straps. Concrete is saw cut in work area and demo of concrete in work area after. Excavation begins and preparations for Pad installation commences. Next, we excavate for the Grade Beam installation. Notch Concrete near existing footings form Grade Beam is installed. We haul and dump broken concrete slab and excavated soil and make sure the area of work is Clean and Secure each day.

    Rebar is delivered for Pads and Grade Beam and installed. Then, we Drill dowel holes in existing concrete and install rebar into holes with adhesive, as per engineered plan. At top of pads, anchor bolts are positioned and temporary base plates are installed. A LADBS Inspection is called. Concrete is poured for pads and Non-shrinking material is installed. Offsite fabrication of Structural Steel Frames is delivered to site. Inspection is called again. Truck transported Steel Frame is installed with a Reach Forklift, and Inspection is called. Rebar is Installed for Grade Beams, and a rebar inspection is called. The inspector checks to see if all rebar is installed as per code. Concrete is then poured for Grade Beams. The Steel Frame is then connected to the building Floor Girder. Stucco is opened to install Collector Splices and to install A-35 connectors. Prepped A-35 connector access holes and Collector Splice areas for stucco
    Build box. 7/8″ fire rated stucco is prepped for cover and Installed. Soil is then compaction as needed, forming wood for concrete is placed, and the final concrete slab is poured.

    For more info check out:
    Weinstein construction – https://www.weinsteinconstruction.com/soft-story/

    To see if your apartment needs a soft story retrofit check out:

    Los Angeles Times – https://graphics.latimes.com/soft-story-apartments-needing-retrofit/

    https://www.latimes.com/visuals/graphics/la-g-retrofiitting-wood-frame-soft-story-buildings-20151005-htmlstory.html