Hot sale Factory ASTM A193 A320 B8M Threaded Stud Bolts for Peru Factory

ASTM A193 A320 B8M Full Threaded Stud Bolts Standard: IFI-136, ASME B16.5, DIN976 Inch Size: 1/4”-4” with various lengths Metric Size: M6-M100 with various lengths Other Available Grade: ASTM A193/A193M B8 Class 1 & 2, B8M Class 1 & 2, ASTM A320/A320M B8 Class 1 & 2, B8M Class 1 & 2 Finish: Plain, PTFE etc. Packing: Bulk about 25 kgs each carton, 36 cartons each pallet Advantage: High Quality and Strict Quality Control, Competitive Price,Timely Delivery; Technical Support, Supply Test Reports Please feel free to contact us for more details.

  • Hot sale Factory ASTM A193 A320 B8M Threaded Stud Bolts for Peru Factory Related Video:



    Learn how to tarp a roof to limit the damage that a leaky roof may cause after a hurricane. This video from Lowe’s will explain how to find a roof leak and how to fix a roof leak temporarily with a roof tarp after a heavy storm.

    After a large storm, hiring a professional to fix a roof leak may take some time due to high demand. In this time period, installing a tarp to your roof is essential to prevent further water damage.

    First, clean the debris from your roof. Locate the leaking area by looking for broken or missing shingles or panels, and check the underside of the sheathing in the attic for water stains. Then, unroll the tarp over the damaged area, allowing 4 feet to overhang the peak. Use cap nails to attach the tarp to 2×4′s. Wrap the tarp around the board and anchor the tarp and 2×4 to the roof with screws.

    Next, attach 2x4s to the edges of the tarp on the peak side. On the other end, nail the tarp to a 2×4, wrap the tarp around the board, and screw it to the underside.

    Subscribe to Lowe’s YouTube: https://www.youtube.com/subscription_center?add_user=lowes
    Or head to our channel: https://www.youtube.com/Lowes

    You can call Lowe’s for a professional roof installation at 1-877-GO LOWES.



    Martin Brundle explains everything about the wheel.