A short video showing how I built a garden windmill out of a Pallet lat, a piece of plyboard I rescued from the side of a wooden crate and some lollipop sticks. The tools used to make this were a table saw, chop saw, cordless drill, jigsaw and a glue gun.
You probably are aware that the ongoing construction of the standard gauge railway will cost the government and by extension you the tax payer over 327B shillings.
Billed as the single largest infrastructure investment project in Kenya, you could be wondering what that money will go into.
In our second episode of ‘Rail To The Future’ series Faizal Ahmed takes a look at all the technical details that are involved in the construction of the railway right down to the last bolt, including reclaiming of 200m stretch of land from the Indian Ocean.