2017 Super Lowest Price ASTM A325M 8S Heavy Hex Structural Bolts Supply to Czech

ASTM A325M 8S Metric Size Heavy Hex Structural Bolts The bolts are intended for use in structural connections. These connections are covered under the requirements of the Specification for Structural Joints Using ASTM A325 Bolts, approved by the Research Council on Structural Connections, endorsed by the American Institute of Steel Construction and by the Industrial Fastener Institute.   Dimension: ASME/ANSI B18.2.3.7M Thread Size: M12-M36 with various length Grade: ASTM A325M Type-1 Grade Marking: A325M 8S Finish: Black Oxide, Zinc Plating, Hot Dip Galvanized, Dacromet, and so on Packing: Bulk about 25 kgs each carton, 36 cartons each pallet   Advantage: High Quality and Strict Quality Control, Competitive price,Timely delivery; Technical support, Supply Test Reports Please feel free to contact us for more details.  

  • 2017 Super Lowest Price ASTM A325M 8S Heavy Hex Structural Bolts Supply to Czech Related Video:



    This is how to mount a bottle cage on a bike without bottle cage mount screws/braze ons, or that doesn’t have the screws/braze ons where you want to mount the bottle cage. I have previously used this technique to mount a second water bottle cage on a mountain bike that only had mounts for a single water bottle cage.

    **If the video was useful or interesting please give it a “thumbs up” and consider subscribing.

    -Website: https://www.RJTheBikeGuy.com
    -Facebook: https://www.facebook.com/RJTheBikeGuy
    -Subscribe Here: https://www.youtube.com/subscription_center?add_user=shyflirt1
    -YouTube Channel: https://www.youtube.com/RJTheBikeGuy



    Buy everything you see in these video’s here online Now:
    Tub And Shower Faucet: https://go.magik.ly/ml/a583/
    Extra cover plate: https://go.magik.ly/ml/a64f/
    Moen Tub and shower cartridge: https://go.magik.ly/ml/a64a/
    1/2 copper 90′s: https://go.magik.ly/ml/a64i/
    1/2 Copper Streed 90′s: https://go.magik.ly/ml/a64l/
    1/2 Brass wing 90: https://go.magik.ly/ml/a64o/
    Gas and touch set: https://go.magik.ly/ml/a64q/
    In this video we start by removing the old two handle tub and shower valve from inside the wall. First we remove the handles and spout leaving the shower head in place to hold up the old shower valve and keeping it there until the new shower valve is in place this makes it easy and keeps use inline with the new installation and makes it very easy to line up the new shower head. Now that we have the handle off its time to go around on the back side and cut into the wall or if were lucky there just may be a trap door on the back side that gives us access to the tub and shower valve from the back side. Once on the back side of the tub and shower valve we start by disconnecting the unions on the old two handle tub and shower valve. Now the part that goes up to the shower head is copper. What we are going to do here is take our torch and heat the solder connection and pull the valve loose from the shower head riser pipe. Now with the old tub and shower valve out the way lets go back to the front side in the bath room. Now this was a three handle tub and shower valve so were going to have to make some adjustments to the hole in the wall in this case we will have to open the middle hole a little wider for the new single handle tub and shower valve. This is not your standard drywall (sheetrock) wall this is old and very thick no cutting this with a saw saw. What were going to do here is use a hammer and just lightly knock out pieces of the wall slow and easy. Don’t worry about covering up the old holes they make a cover plate for that. We have the hole just how we won’t it lets go back to the other side behind the tub and shower. What I like to do is put my new tub and shower valve to gather and solder pieces in place before I start working in the wall with it and I also remove the washers in the valve so we don’t damage the washers with the hot torch and burn them up once all this is done I take the tub and shower valve and put it into place line it up and make all the necessary connections from the back side from here I go back to the front of the valve in that bath room and start putting all the trim on but installing the cover plate first then if you like caulk it. Thank you for watching coolplumbingvideos.

    -~-~~-~~~-~~-~-
    Please watch: “Pex Pipe Plumbing (The Complete Series)