14 Years Manufacturer EN 14399-3 and 7 Structural Bolt Set for Proloading for Bahamas Manufacturers

BS EN 14399-3 and 7 System HR Structural Bolt Set for Preloading DIN EN 14399-3 and 7 System HR Structural Bolt Set for Preloading Thread Size: M12-M36 with various length Grade: Bolt-10.9/8.8, Nut-10/8, Washer-300~370HV Finish: Black Oxide, Zinc Plating, Hot Dip Galvanized, Dacromet, and so on Packing: Bulk about 25 kgs each carton, 36 cartons each pallet Advantage: High Quality and Strict Quality Control, Competitive price,Timely delivery; Technical support, Supply Test Reports Please feel free to contact us for more details.

  • 14 Years Manufacturer EN 14399-3 and 7 Structural Bolt Set for Proloading for Bahamas Manufacturers Related Video:



    Music: Aufbruch im Kartoffelfeld – Melodie by Paul G. Walter

    We are going to install a new fork.
    First you put the lower slotted ring on the steer tube
    Now put the steer tube trough the head tube and install the upper slotted ring and cover plate.
    Now install all the spacers you need.
    Push the fork up and install the stem. Now mark the upper edge of stem on steer tube.
    Use a tool to fix the forks in to the vice and cut the steer tube about 3 mm below the line you draw.
    Smooth the sharp edges with the file.
    Now you have to install the star nut. I used a small screwdriver and a rubber hammer. Be careful not to damage the legs at the bottom.
    Heavily grease lower slotted ring and upper bearing.
    Install the fork and the slotted ring.
    Put on cover plate, spacers, stem and top cap. Tighten the screw to the point where the fork has no play.
    Tighten the bolts of the stem.